Importing Data From Existing XBRL WIP Reports

www.altova.com Print this Topic Previous Page Up One Level Next page

Home >  Importing Data >

Importing Data From Existing XBRL WIP Reports

You can import data from existing instances of XBRL WIP reports into Excel (typically, files with either .xbrl or .xml extension). For the import to be successful, the imported instances must be valid XBRL WIP reports. They may be either reports you have previously generated using the Altova Work in Process (WIP) XBRL add-in for Excel, or reports that you received from other parties.

 

When you import data from an XBRL instance file, the Excel sum formulas are overridden by the imported values. After the import, you will need to restore the Excel formulas to the default state. To do this, click Reset WIP Report Data > Restore only formulas in the Excel ribbon (see Resetting Data and Restoring Formulas).

 

 

To import an XBRL US WIP report instance file into Excel:

1.In the Excel ribbon, click the WIP tab.
2.Click Insert.
3.Click Import XBRL, and browse for the XBRL instance file.

wip_ribbon_import

Before the report data is loaded into Excel, it is automatically validated. The Validation Report window notifies you about potential warnings, inconsistencies, or errors (see also Validating Data).

wip_validation_report

Note:During import, the add-in validates XBRL formula assertions. A report will be imported even if it contains unsatisfied assertions.

© 2019 Altova GmbH